A plumber laying 500meters of drain pipe requires 20men working for 10days. What length in meters would be laid by 50men in 5days, if they all work at same rate?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:20
At his new job, jeremiah can choose an hourly rate of $9 plus a $50 weekly bonus for opening the store, or an hourly rate of $10 per hour with no opening bonus. the equations model his salary options. y = 9x + 50 y = 10x
Answers: 2
question
Mathematics, 21.06.2019 17:30
The sales totals at macy's food store have increased exponentially over the months. which of these best shows the sales in the first three months?
Answers: 2
question
Mathematics, 21.06.2019 20:00
If cos(2x) = tan^2(y), show that cos(2y) = tan^2(x).
Answers: 3
question
Mathematics, 21.06.2019 20:50
The first side of a triangle measures 5 in less than the second side, the third side is 3 in more than the first side, and the perimeter is 17 in. how long is the third side? if s represents the length of the second side, which of the following represents the length of the third side? s-5 ws-2 s+ 3 next question ask for turn it in
Answers: 1
You know the right answer?
A plumber laying 500meters of drain pipe requires 20men working for 10days. What length in meters wo...
Questions
question
Mathematics, 11.10.2020 14:01
question
Mathematics, 11.10.2020 14:01
question
Mathematics, 11.10.2020 14:01
question
Mathematics, 11.10.2020 14:01
question
Social Studies, 11.10.2020 14:01
Questions on the website: 13722360