subject
Mathematics, 13.06.2020 00:57 paigejosie6473

In a factory, an automated machine can produce 1 1/2 tons of sheet metal per hour. Assume the automated machine produces the same number of tons per hour. This problem has a constant rate of change. Create four ordered pairs, a table, a graph and write an equation that can be modeled by this situation.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:20
Tomas used 3 1/3 cups of flour and now has 1 2/3cups left. which equation can he use to find f, the number of cups of flour he had to begin with? f+3 1/3=1 2/3 f-3 1/3=1 2/3 3 1/3f=1 2/3 f/3 1/3=1 2/3
Answers: 1
question
Mathematics, 21.06.2019 21:30
This is a map of the mars exploration rover opportunity predicted landing site on mars. the scale is 1cm : 9.4km. what are the approximate measures of the actual length and width of the ellipse? i mostly need to know how to set it up : )
Answers: 3
question
Mathematics, 21.06.2019 23:00
Which equation can be used to measure the density of water in a spherical water tank? let w represent the number of water particles within the region.
Answers: 3
question
Mathematics, 21.06.2019 23:30
Which choice has the correct steps in graphing the solution set to the following inequality? -45_> 20x-5y
Answers: 1
You know the right answer?
In a factory, an automated machine can produce 1 1/2 tons of sheet metal per hour. Assume the automa...
Questions
question
Mathematics, 14.07.2019 06:30
Questions on the website: 13722367