subject
Mathematics, 16.06.2020 18:57 Jonah58

Mrs. Jackson made a line plot of the times it took students to complete a project. She made a line plot to display the data. Line plot named as ALTDCTime Spent Completing ProjectALTDC shows a number line from 0 to 5. The number line is divided into 10 equal parts. 1 dot on 1, 2 dots on one and half, 4 dots on 2, 3 dots on two and half, 2 dots on three and half, 1 dot on 4 and 1 dot on four and half is given. Part A What is the outlier in the data set? A. 1 B. 2 C. 3 D. There is no outlier.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:50
Provide an example of a trigonometric function and describe how it is transformed from the standard trigonometric function f(x) = sin x, f(x) = cos x, or f(x) tan x using key features.
Answers: 3
question
Mathematics, 21.06.2019 20:30
Arectangle has a width of 5 cm and a length of 10 cm. if the width is increased by 3, how does the perimeter change?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Aladder that is 20ft long is leaning against the side of a building. if the angle formed between the ladder and the ground is 75 degrees how far is the bottom of the from the base of the building?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Abicycle training wheel has a radius of 3 inches. the bicycle wheel has a radius of 10 inches.approximately how much smaller, in square inches and rounded to the nearest hundredth, is the area of the training wheel than the area of the regular wheel? *
Answers: 3
You know the right answer?
Mrs. Jackson made a line plot of the times it took students to complete a project. She made a line p...
Questions
question
Mathematics, 27.08.2020 16:01
question
Mathematics, 27.08.2020 16:01
Questions on the website: 13722359