Mathematics, 17.06.2020 05:57 mandy9386
Suppose worker A averages 100 picks per hour, worker B averages 60 picks per hour, and worker C averages 40 picks per hour. [20 points]
a. If the 3 workers work in a bucket brigade, in which order the workers should be arranged?
b. If the average order requires 100 picks, what would be the average rate of order completion of the team under bucket brigades?
c. Assume the 3 workers are assigned into zones with equal work in each. What is the average rate of order completion of the team when the workers are arranged in A à B à C order?
Answers: 2
Mathematics, 21.06.2019 18:00
You spin the spinner shown below once. each sector shown has an equal area. what is p(beaver ) p(beaver)? if necessary, round your answer to 2 2 decimal places.
Answers: 2
Mathematics, 21.06.2019 21:30
Mis the midpoint of rq if rm equals 2x + 5 and mq equals 4x - 9 what is the length of rq
Answers: 1
Mathematics, 22.06.2019 04:00
The given dot plot represents the average daily temperatures, in degrees fahrenheit, recorded in a town during the first 15 days of september. if the dot plot is converted to a box plot, the first quartile would be drawn at , ( 59,60,61,62) and the third quartile would be drawn at . (61,62,63,64)
Answers: 2
Suppose worker A averages 100 picks per hour, worker B averages 60 picks per hour, and worker C aver...
Mathematics, 01.07.2019 05:30
English, 01.07.2019 05:30
English, 01.07.2019 05:30
English, 01.07.2019 05:30
Mathematics, 01.07.2019 05:30
Biology, 01.07.2019 05:30
Mathematics, 01.07.2019 05:30
Health, 01.07.2019 05:30