A 50 million gallon per day (mgd) sanitary water treatment plant was constructed in 1990 at Boston, MA for 150 million dollars. A similar treatment plant with is planned for construction in 2025 in Springfield, MA. The new plant will have a capacity of 30 mgd. Determine the following:A) The estimated cost of the new treatment plant in 1990 dollars. Use Cost Capacity Factor Method and assume p = .75. Assume city-cost indices are: Boston = 115, Springfield = 102. (5) B) The estimated cost of the new treatment plant in 2025 dollars. According to the 2025 projected cost index = 235.6 and the historical cost index for 1990 was 94.3.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Easy points boii. read it. ya. fresh
Answers: 1
question
Mathematics, 21.06.2019 15:30
David must install fencing around a lot that is shaped like a right angle.the side of lot that runs east-west is 200 ft long.the side of the lot runs north-south is 125 ft long.calculate how many feet of fencing he will need to surround the entire lot.
Answers: 2
question
Mathematics, 21.06.2019 19:30
What is the effect on the graph of the function f(x)=x when f(x) is replaced with -f(x)+4
Answers: 1
question
Mathematics, 21.06.2019 19:30
Acollection of coins has value of 64 cents. there are two more nickels than dimes and three times as many pennies as dimes in this collection. how many of each kind of coin are in the collection?
Answers: 1
You know the right answer?
A 50 million gallon per day (mgd) sanitary water treatment plant was constructed in 1990 at Boston,...
Questions
question
History, 11.10.2019 20:30
question
Mathematics, 11.10.2019 20:30
Questions on the website: 13722363