subject
Mathematics, 28.07.2020 15:01 sxbenn

In the following activity, write an equation to represent each verbal statement, and use it to find the value of each unknown number. Then, put the solution values in order from smallest to largest. [Note: The smallest solution is "first", and the largest solution is "fifth".] 1. fourth The difference between four times a number and five has a result of negative eight. 2. first The sum of a number and two is equal to the quotient of six and negative four. 3. third The difference between a number and five is multiplied by negative two. The resulting product equals fourteen. 4. second The sum of a number and three is divided by five. The result is negative two. 5. fifth Half of a number is added to four. This sum is equivalent to negative one. HELP ME PLEASE, I BEG YOU

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:20
What should be done to solve the equation? x+14=21 add 14 to both sides of the equation. subtract 14 from the left side of the equation. add 14 to the left side and subtract 14 from the right side of the equation. subtract 14 from both sides of the equation.
Answers: 2
question
Mathematics, 21.06.2019 18:00
Negative 5 1/12 + negative 4 1/4 + 6 3/4
Answers: 1
question
Mathematics, 21.06.2019 19:00
Pyotr tchaikovsky sporting goods operates on a 45% overhead based on the selling price, which results in an overhead of $65.34 on the newest version of an air hockey game set. if the air hockey game set costs pyotr tchaikovsky sports $49.32, find the selling price, the markup, and the net profit.
Answers: 2
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
In the following activity, write an equation to represent each verbal statement, and use it to find...
Questions
question
World Languages, 30.07.2019 15:30
question
History, 30.07.2019 15:30
Questions on the website: 13722360