Mathematics, 26.08.2020 02:01 pinnij20
On average, it takes a shoe factory 21 minutes, with a standard deviation of 3 minutes, to manufacture a pair of running shoes. How often will it take the factory more than 27 minutes to manufacture a pair of running shoes? Note: Assume that a Normal model is appropriate for the distribution of manufacturing times.
Answers: 3
Mathematics, 21.06.2019 18:00
Does anyone know how to do geometryme with this problem
Answers: 1
Mathematics, 21.06.2019 19:00
Moira has a canvas that is 8 inches by 10 inches. she wants to paint a line diagonally from the top left corner to the bottom right corner. approximately how long will the diagonal line be?
Answers: 1
Mathematics, 21.06.2019 21:00
If there are 3.281 feet in 1 meter, how many inches are in one centimeter
Answers: 1
Mathematics, 21.06.2019 22:00
Iam at home. /: i am playing video games. translate the following statement into symbolic form.
Answers: 2
On average, it takes a shoe factory 21 minutes, with a standard deviation of 3 minutes, to manufactu...
Physics, 31.07.2019 05:00
Mathematics, 31.07.2019 05:00
Mathematics, 31.07.2019 05:00
Spanish, 31.07.2019 05:00
Physics, 31.07.2019 05:00
Mathematics, 31.07.2019 05:00
History, 31.07.2019 05:00
English, 31.07.2019 05:00