subject
Mathematics, 22.09.2020 22:01 candycrush24

A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company manufactures the shafts and frames but purchases the ball bearings from a ball bearing manufacturer. Each shaft must be processed on a forging machine, a lathe, and a grinder. These operations require 0.6 hour, 0.3 hour, and 0.4 hour per shaft, respectively. Each frame requires 0.8 hour on a forging machine, 0.2 hour on a drilling machine, 0.3 hour on a milling machine, and 0.6 hour on a grinder. The company has 5 lathes, 10 grinders, 20 forging machines, 3 drillers, and 6 millers. Assume that each machine operates a maximum of 4500 hours per year. Required:
Formulate the problem of finding the maximum number of assembled components that can be produced as a linear program.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
The temperature of chicken soup is 192.7°f. as it cools, the temperature of the soup decreases 2.3°f per minute. what is the temperature in degrees fahrenheit of the soup after 25 minutes? a. 27.3°f b. 57.5°f c. 135.2°f d. 250.2°f
Answers: 1
question
Mathematics, 22.06.2019 00:20
Jubal wrote the four equations below. he examined them, without solving them, to determine which equation has no solution. which of jubal’s equations has no solution hurry
Answers: 1
question
Mathematics, 22.06.2019 01:30
Which of the following is an irrational number
Answers: 1
question
Mathematics, 22.06.2019 05:30
How do you solve questions 29 and 31?
Answers: 1
You know the right answer?
A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company m...
Questions
question
Mathematics, 07.12.2020 18:00
question
Mathematics, 07.12.2020 18:00
question
Mathematics, 07.12.2020 18:00
question
Mathematics, 07.12.2020 18:00
question
Mathematics, 07.12.2020 18:00
Questions on the website: 13722361