subject
Mathematics, 24.09.2020 15:01 noeliaortiz3478

the daily cost of hiring a plumber, y, to work x hours on a repair project can be modeled usin a linear function. The plumber charges a fixed ost of $80 plus an additional cost of $45 per hour. The plumber works a maxium of 8 hours per day. For one day of work, what are the minimum and maximum values in the range for this situation

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Add the two expressions 3.8b - 7 and 2.9b + 9 enter your answer in simplified form
Answers: 1
question
Mathematics, 21.06.2019 18:00
Kayla has a $500 budget for the school party.she paid $150 for the decorations.food will cost $5.50 per student. what inequality represents the number of students,s, that can attend the party?
Answers: 1
question
Mathematics, 21.06.2019 20:00
Given ab and cb are tangents of p, and m =10°. what is the measure of abp?
Answers: 1
question
Mathematics, 21.06.2019 20:10
In the diagram, points d and e are marked by drawing arcs of equal size centered at b such that the arcs intersect ba and bc. then, intersecting arcs of equal size are drawn centered at points d and e. point p is located at the intersection of these arcs. based on this construction, m , and m
Answers: 1
You know the right answer?
the daily cost of hiring a plumber, y, to work x hours on a repair project can be modeled usin a lin...
Questions
question
Mathematics, 03.02.2020 12:43
question
Biology, 03.02.2020 12:43
question
English, 03.02.2020 12:43
Questions on the website: 13722363