You are remodeling your kitchen. You've contacted two tiling companies who gladly told you how long it took their workers to tile a floor of a similar size.
Jim completed half the floor in 7 hours. Pete completed the other half of the
floor in 6 hours. If Pete can lay 15 more tiles per hour than Jim, what equation
would you use to find the rate that Jim can lay tiles? Let x represent Jim's
rate.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
It is saturday morning and jeremy has discovered he has a leak coming from the water heater in his attic. since plumbers charge extra to come out on the weekends, jeremy is planning to use buckets to catch the dripping water. he places a bucket under the drip and steps outside to walk the dog. in half an hour the bucket is 1/5 of the way full. what is the rate at which the water is leaking per hour?
Answers: 1
question
Mathematics, 21.06.2019 20:50
What is the greatest number of parts of a circle that can be formed by cutting the circle with 7 straight cuts? (note: the parts do not have to be equal in size)
Answers: 3
question
Mathematics, 21.06.2019 21:30
Ok a point t on a segment with endpoints d(1, 4) and f(7, 1) partitions the segment in a 2: 1 ratio. find t. you must show all work to receive credit.
Answers: 1
question
Mathematics, 21.06.2019 23:00
Solve for n. round to the tenths place, if necessary. 14.2 cups of flour6 loaves of bread= 20 cups of flour n
Answers: 2
You know the right answer?
You are remodeling your kitchen. You've contacted two tiling companies who gladly told you how long...
Questions
question
Mathematics, 16.10.2020 07:01
question
Mathematics, 16.10.2020 07:01
question
English, 16.10.2020 07:01
question
Mathematics, 16.10.2020 07:01
question
Mathematics, 16.10.2020 07:01
question
Biology, 16.10.2020 07:01
Questions on the website: 13722361