Mathematics, 07.10.2020 05:01 gibesanna11p5nn28
A manufacturer produces two models of toy airplanes. It takes the manufacturer 5 minutes to assemble model A and 3 minutes to package it. It takes the
manufacturer 8 minutes to assemble model B and 2 minutes to package it. In a given week, the total available time for assembling is 800 minutes, and the total
available time for packaging is 360 minutes. Let x be the number of model A units produced. Let y be the number of model B units produced. Shade the region
corresponding to all values of x and y that satisfy these requirements.
Answers: 1
Mathematics, 21.06.2019 15:00
An advertising firm has an old computer that can prepare a whole mailing in 6 hours. with the of newer model the job is complete in 2 hours. how long would it take the newer model to do the job alone?
Answers: 1
Mathematics, 21.06.2019 19:00
Me with geometry ! in this figure, bc is a perpendicular bisects of kj. dm is the angle bisects of bdj. what is the measure of bdm? •60° •90° •30° •45°
Answers: 2
Mathematics, 22.06.2019 03:00
Which statement is true about the local minimum of the graphed function? over the interval[-4,-2], the local minimum is 0. over the interval [-2,-1] , the local minimum is 25. over the interval [-1,4], the local minimum is 0. over the interval [4,7], the local minimum is -7
Answers: 2
A manufacturer produces two models of toy airplanes. It takes the manufacturer 5 minutes to assemble...
Mathematics, 26.11.2021 18:50
Mathematics, 26.11.2021 18:50
Mathematics, 26.11.2021 18:50
Mathematics, 26.11.2021 18:50
English, 26.11.2021 18:50
Mathematics, 26.11.2021 18:50
History, 26.11.2021 18:50
Health, 26.11.2021 18:50
Mathematics, 26.11.2021 18:50
History, 26.11.2021 18:50
Social Studies, 26.11.2021 18:50
Social Studies, 26.11.2021 18:50