Mathematics, 11.10.2020 09:01 karlyisaunicorn

A construction company needs to remove 24 tons of dirt from a construction site. They can remove 3/4 tons of dirt each hour. How long will take to remove the dirt? Write your answer in hours.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
How do you divide 9/4 divided by 10/3
Answers: 1
question
Mathematics, 21.06.2019 14:00
Which product is positive a is 2/5 -8/9 -1/3 -2/7 b is -2/5 8/9 -1/3 -2/7 c is 2/5 8/9 1/3 -2/7 d is -2/5 -8/9 1/3 2/7
Answers: 2
question
Mathematics, 21.06.2019 18:00
Jack has a piece of red ribbon that is two times as long as his piece of blue ribbon. he says that he can use two different equation to find out how long his piece of red ribbon is compared to his piece of blue ribbon is. is he correct? explain his reasoning
Answers: 1
question
Mathematics, 21.06.2019 19:20
Based on the diagram, match the trigonometric ratios with the corresponding ratios of the sides of the triangle. tiles : cosb sinb tanb sincposs matches: c/b b/a b/c c/a
Answers: 2
You know the right answer?
A construction company needs to remove 24 tons of dirt from a construction site. They can remove 3/4...
Questions
question
Mathematics, 14.12.2019 19:31
Questions on the website: 13722362