Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 22:10
This is a rational expression because the denominator contains a variable. this is a polynomial with 3 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 4 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 4 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 3 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 5 terms.
Answers: 2
Mathematics, 22.06.2019 00:30
"which statement is necessarily true if bd is an altitude to the hypotenuse of right ? abc? a.) ? adb? ? bdc b.) ? adb~? bdc c.) abbc=acbd d.) ? bac? ? bdc"
Answers: 3
R=10(a+b) solve for b?...
Physics, 29.10.2020 01:00
Mathematics, 29.10.2020 01:00
History, 29.10.2020 01:00
Mathematics, 29.10.2020 01:00
Mathematics, 29.10.2020 01:00
Social Studies, 29.10.2020 01:00
English, 29.10.2020 01:00
History, 29.10.2020 01:00
Computers and Technology, 29.10.2020 01:00
Mathematics, 29.10.2020 01:00