subject
Mathematics, 18.10.2020 22:01 spalmer8

A construction worker needs to move 120 ft squared (3) of dirt by using a wheelbarrow. One wheelbarrow load holds 8 ft squared(3) of dirt and each load takes him 10 minutes to complete
. One
correct way to figure out the number of hours he would need to complete this job is

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
What is the volume of a cone with a height of 6 cm in the radius of 2 cm
Answers: 1
question
Mathematics, 21.06.2019 20:30
What is 1/3x5 on anuber line what does it look like on a number line
Answers: 3
question
Mathematics, 21.06.2019 23:50
What is the inverse of f(x) = 6x -24
Answers: 1
question
Mathematics, 22.06.2019 00:30
Long division setup showing an incomplete calculation. 12 is in the divisor, 6839 is in the dividend, and 5 hundreds and 6 tens is written in the quotient. 6000 is subtracted from 6839 to give 839. an unknown value represented by a box is being subtracted from 839. what number should be placed in the box to complete the division calculation?
Answers: 3
You know the right answer?
A construction worker needs to move 120 ft squared (3) of dirt by using a wheelbarrow. One wheelbar...
Questions
question
Mathematics, 29.09.2019 14:50
Questions on the website: 13722367