Below are arrival and service times of four single-server queues. (Hint: Mean arrrival time of 4 and mean service time of 3 are the same across all the queues, but their ranges are different.) (Queue W) Customer: 1 2 4 5 8 Mean Arrival times (hrs): 3 4 3 5 5 5 Service times (hrs): 1 4 5 2 1 3 P 100 w WIN и NN 4 4 NI Ne
(Queue X) Customer Arrival times (hrs): Service times (hrs): 1 3 2 3 3 4 5 5 4 6 5 3 7 4 2 8 Mean 5 4 3 3 4 4
(Queue Y) Customer: Arrival times (hrs); Service times (hrs): 1 4 3 2 7 mim 4 5 2 5 1 4 6 2 NN 8 Mean 6 4 2 3 4 4
(Queue Z) Customer: Arrival times (hrs): Service times (hrs): 1 4 1 2 7 5 3 3 4 4 5 2 5 1 4 6 2 5 8 Mean 6 4 1 3 3
5. (American Vending) Use the posted queueing template. For one repair worker, the average flow time (W) is For two repair workers, the average flow time (W) is For three repair workers, the average flow time (W) is
A. 0.4, 0.204, 0.225
B. 0.5, 0.204, 0.225
C. 0.4, 0.225, 0.204
D. 0.5, 0.225, 0.204
E. 0.4, 0.304, 0.325
F. 0.5, 0.304, 0.325
G. 0.4, 0.325, 0.304
H. 0.5, 0.325, 0.304
6. (American Vending) Use the Little's law to find average down machines in the entire system (L). (Note: To avoid rounding errors, use exactly the same average flow time (W) in the previous question.) -- For one repair worker, average down machines in the entire system (L) are For two repair workers, average down machines in the entire system (L) are For three repair workers, average down machines in the entire system (L) are
A. 1.5, 0.61, 0.68
B. 2.5, 0.61, 0.68
C. 1.5, 0.68, 0.61
D. 2.5, 0.68, 0.61
E. 1.5, 0.71, 0.78
F. 2.5, 0.71, 0.78
G. 1.5, 0.78, 0.71
H. 2.5, 0.78, 0.71 7.
(American Vending) Each repair worker is paid $4 per hour and downtime costs the company $25 per hour per machine. Calculate total cost (= worker cost + downtime cost). (Note: To avoid rounding errors, use exactly the same average number of down machines (L) in the previous question.) --- For one repair worker, total cost is -- For two repair workers, total cost is --- For three repair workers, total cost is
A. 21.5, 15, 17.25
B. 41.5, 15, 17.25
C. 21.5, 17.25, 15
D. 41.5, 17.25, 15
E. 21.5, 25, 27.25
F. 41.5, 25, 27.25
G. 21.5, 27.25, 25
H. 41.5, 27.25, 25
8. (American Vending) The optimal crew size is
A. 1 E 5
B. 2 F. 6
C. 3 G. 7
D. 4 H. 8

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:20
G(x) = 2 sin(2x - π) + 4. using complete sentences, explain how to find the minimum value for the function.
Answers: 3
question
Mathematics, 21.06.2019 16:00
Which shows the pre image of triangle xyz
Answers: 1
question
Mathematics, 21.06.2019 18:00
The brain volumes (cm cubed) of 50 brains vary from a low of 904 cm cubed to a high of 1488 cm cubed. use the range rule of thumb to estimate the standard deviation s and compare the result to the exact standard deviation of 175.5 cm cubed, assuming the estimate is accurate if it is within 15 cm cubed
Answers: 2
question
Mathematics, 21.06.2019 19:30
Zoey made 5 1/2 cups of trail mix for a camping trip. she wants to divide the trail mix into 3/4 cup servings. a. ten people are going on the trip. can zoey make enough 3/4 cup servings so that each person gets one serving? b. what size would the servings need to be for everyone to have a serving?
Answers: 1
You know the right answer?
Below are arrival and service times of four single-server queues. (Hint: Mean arrrival time of 4 and...
Questions
question
Mathematics, 25.08.2019 13:30
question
Physics, 25.08.2019 13:30
question
Mathematics, 25.08.2019 13:50
Questions on the website: 13722359