subject
Mathematics, 20.10.2020 20:01 odalysesquermon

A study was performed on the sustainability behaviors of CPA corporations, based on the responses of 1,618 senior managers. Corporate sustainability refers to business practices designed around social and environmental considerations. The level of support senior managers have for corporate sustainability was measured quantitatively on a scale ranging from 0 to 160 points. The study provided the following information on the distribution of levels of support for sustainability: u = 74, o = 22. Now consider a random sample of 50 senior managers and let x represent the sample mean level of support. Complete parts a through d below. a. Give the value of hy, the mean of the sampling distribution of X, and interpret the result
;= (Type an integer or a decimal. Do not round.)
The mean of the sampling distribution of is the population mean.
b. Give the value of o;, the standard deviation of the sampling distribution of , and interpret the result. 0:- (Round to two decimal places as needed.) The standard deviation of the sampling distribution of X is the population standard deviation.
c. What does the Central Limit Theorem say about the shape of the sampling distribution of 7
A. The shape is approximately that of a binomial distribution.
B. The shape is approximately that of a Poisson distribution.
C. The shape is approximately that of a normal distribution.
D. The shape is approximately that of a uniform distribution.
d. Find P(X>72). P(x>72) = (Round to three decimal places needed.)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
Allie answered 72% of the questions on her math test correctly. if she answered 18 questions correctly, how many questions were on the test?
Answers: 1
question
Mathematics, 21.06.2019 15:30
The average hourly earnings for a construction worker is projected to be $24.50 in 2012. jason wants to join the construction work force after he graduates in 2012. his friend tells him that average hourly earnings for construction workers will rise by 2% from 2009 to 2012. based on the data below, assuming that the projected hourly earnings are correct, is jason’s friend’s statement accurate? construction industry - average hourly earnings, 2000-2009 a. his friend’s statement is accurate. the average hourly earnings will increase by 2%. b. his friend’s statement is not accurate. the percent increase will be more than 2% c. his friend’s statement is not accurate. the percent increase will be less than 2% d. his friend’s statement is not accurate. the average hourly earnings will decrease
Answers: 3
question
Mathematics, 21.06.2019 16:30
In the diagram of circle a what is m
Answers: 1
question
Mathematics, 21.06.2019 19:30
If y varies directly as x2 and y=6 when x=6, find the constant of variation.
Answers: 2
You know the right answer?
A study was performed on the sustainability behaviors of CPA corporations, based on the responses of...
Questions
question
Mathematics, 26.05.2021 21:30
question
Mathematics, 26.05.2021 21:30
question
History, 26.05.2021 21:30
question
History, 26.05.2021 21:30
question
Mathematics, 26.05.2021 21:30
Questions on the website: 13722361