subject
Mathematics, 23.10.2020 09:01 baileymtamayo

A job can be completed in 30 days by 12 men. If the job is required to be completed in 12 days earlier, how many more men are required
if they are working at the same rate?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Identify the converse of the following conditional: if a point is in the first quadrant, then its coordinates are positive. if the coordinates of a point are not positive, then the point is not in the first quadrant. if the coordinates of a point are positive, then the point is in the first quadrant. if a point is in the first quadrant, then its coordinates are positive. if a point is not in the first quadrant, then the coordinates of the point are not positive.
Answers: 2
question
Mathematics, 21.06.2019 23:00
I'm at a bookstore with $\$35$ in my pocket and a $20\%$-off coupon. what is the cost of the most expensive book i can buy with my money and the coupon? (assume that there are books of every possible price in the bookstore. it's a large bookstore! )
Answers: 1
question
Mathematics, 22.06.2019 01:40
(co 3) the soup produced by a company has a salt level that is normally distributed with a mean of 5.4 grams and a standard deviation of 0.3 grams. the company takes readings of every 10th bar off the production line. the reading points are 5.8, 5.9, 4.9, 6.5, 5.0, 4.9, 6.2, 5.1, 5.7, 6.1. is the process in control or out of control and why? it is out of control as two of these data points are more than 2 standard deviations from the mean it is in control as the data points more than 2 standard deviations from the mean are far apart it is out of control as one of these data points is more than 3 standard deviations from the mean it is in control as the values jump above and below the mean
Answers: 2
question
Mathematics, 22.06.2019 06:00
There are 16 tablespoons in one cup. which table correctly relates the number of cups to the number of tablespoons?
Answers: 2
You know the right answer?
A job can be completed in 30 days by 12 men. If the job is required to be completed in 12 days earl...
Questions
question
Geography, 16.01.2021 16:10
Questions on the website: 13722359