subject
Mathematics, 23.10.2020 20:50 KingD3474

A company found that an experienced surveyor can survey a roadbed in 6 hours. An apprentice surveyor needs 10 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the job.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
In triangle △abc, ∠abc=90°, bh is an altitude. find the missing lengths. ab=4 and bc=3, find ah, ch and bh.
Answers: 1
question
Mathematics, 21.06.2019 15:20
Which is the equation of an ellipse with directrices at x = ±4 and foci at (2, 0) and (−2, 0)?
Answers: 3
question
Mathematics, 21.06.2019 19:30
In the given triangle, ∠aed ∼ ∠ abc, ad = 6.9, ae = 7.2, de = 5.2, and bc = 10.2. find the measure of bd and ce. round your answer to the nearest tenth.
Answers: 2
question
Mathematics, 21.06.2019 20:50
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.
Answers: 3
You know the right answer?
A company found that an experienced surveyor can survey a roadbed in 6 hours. An apprentice surveyor...
Questions
question
Physics, 13.04.2021 01:10
question
World Languages, 13.04.2021 01:10
question
Mathematics, 13.04.2021 01:10
Questions on the website: 13722367