Mathematics, 25.10.2020 05:00 Oliviapuffinburger33

A project under consideration has an internal rate of return of 13% and a beta of 0.8. The risk-free rate is 3%, and the expected rate of return on the market portfolio is 13%. a. What is the required rate of return on the project? (Do not round intermediate calculations. Enter your answer as a whole percent.) b. Should the project be accepted? c. What is the required rate of return on the project if its beta is 1.80? (Do not round intermediate calculations. Enter your answer as a whole percent.) d. If project's beta is 1.80, should the project be accepted?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Find the equation of the trend line (line of best fit). show your work i'm using the points (34,76) (42,91)
Answers: 2
question
Mathematics, 21.06.2019 16:10
The probability that a college student belongs to a health club is 0.3. the probability that a college student lives off-campus is 0.4. the probability that a college student belongs to a health club and lives off-campus is 0.12. find the probability that a college student belongs to a health club or lives off-campus. tip: p(a or b) = p(a) + p(b) - p(a and b) 0.54 0.58 0.70 0.82
Answers: 2
question
Mathematics, 21.06.2019 19:00
What term makes it inconsistent y=2x - 4
Answers: 1
question
Mathematics, 21.06.2019 19:30
Runner ran 1 4/5 miles on monday and 6 3/10 on tuesday. how many times her monday’s distance was her tuesdays distance
Answers: 1
You know the right answer?
A project under consideration has an internal rate of return of 13% and a beta of 0.8. The risk-free...