Anne is choosing a contractor. She has narrowed down her selection to two companies and will base her decision on the likelihood that the job is done on
time and on budget. She uses online reviews to estimate the probabilities.
Contractor A
Contractor B
0.93
0.97
Probability that the job
is done on time
0.98
0.96
Probability that the job
is done within budget
Which contractor should Anne choose to maximize the probability that the job
will be done on time and on budget? Assume all events are independent.
A. Contractor B. The probability that both conditions are met is 0.93
B. Contractor A. The probability that both conditions are met is 0.91
C. Contractor B. The probability that both conditions are met is 0.97

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 19:10
Which equation results from adding the equations in this system? x+6y=9 and -x+2y=-15
Answers: 1
question
Mathematics, 22.06.2019 03:00
Let d be the domain and let Ζ’ be the possible function. determine if the relation is an example of a function. d = {x| x is a date, expressed in day/month/year} Ζ’(x) = temperature in seattle washington on that date
Answers: 3
question
Mathematics, 22.06.2019 04:00
Which statements are true about the linear equation y> 3/4x-2? check all that apply
Answers: 2
question
Mathematics, 22.06.2019 07:20
Find the equivalent expression using the same bases. (41 * 31)^2
Answers: 1
You know the right answer?
Anne is choosing a contractor. She has narrowed down her selection to two companies and will base h...
Questions
question
Mathematics, 22.09.2021 19:00
question
Mathematics, 22.09.2021 19:00
question
Physics, 22.09.2021 19:00
question
Mathematics, 22.09.2021 19:10
question
Social Studies, 22.09.2021 19:10
question
English, 22.09.2021 19:10
question
English, 22.09.2021 19:10
question
Mathematics, 22.09.2021 19:10
question
Social Studies, 22.09.2021 19:10
question
History, 22.09.2021 19:10
Questions on the website: 13722362