Mathematics, 27.10.2020 03:20 Shazrts2371
Two groups of workers are painting a bridge in the bay. The first group is responsible for
painting the north side of the bridge, and the second group is responsible for painting the
south side of the bridge. The first group has already painted 5 kilometers of the bridge and is
painting 2 additional kilometers per day. The second group has already painted 1 kilometer of
the bridge and is painting 4 additional kilometers per day. After a while, the two groups will
have painted the same amount of the bridge. How much of the bridge will each group have
painted? How long will that take?
Answers: 1
Mathematics, 21.06.2019 20:00
15m is what percent of 60m; 3m; 30m; 1.5 km? the last one is km not m
Answers: 1
Mathematics, 21.06.2019 22:00
Let event a = you roll an even number on the first cube.let event b = you roll a 6 on the second cube.are the events independent or dependent? why?
Answers: 1
Mathematics, 21.06.2019 22:30
Which of the following represents the factorization of the trinomial below? x^2+7x-30
Answers: 1
Two groups of workers are painting a bridge in the bay. The first group is responsible for
painting...
Biology, 19.05.2020 16:19
Mathematics, 19.05.2020 16:19
Mathematics, 19.05.2020 16:19
Mathematics, 19.05.2020 16:19
Mathematics, 19.05.2020 16:19
Health, 19.05.2020 16:19
English, 19.05.2020 16:19
History, 19.05.2020 16:19
English, 19.05.2020 16:19
Mathematics, 19.05.2020 16:19
History, 19.05.2020 16:19