Bob can do a job in 5 hours while Bill can do the same job in 8. How many hours would it take them, working together, to do this job?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 20:40
In each of the cases that follow, the magnitude of a vector is given along with the counterclockwise angle it makes with the +x axis. use trigonometry to find the x and y components of the vector. also, sketch each vector approximately to scale to see if your calculated answers seem reasonable. (a) 50.0 n at 60.0°, (b) 75 m/ s at 5π/ 6 rad, (c) 254 lb at 325°, (d) 69 km at 1.1π rad.
Answers: 3
question
Mathematics, 21.06.2019 21:10
Mackenzie needs to determine whether the rectangles are proportional. which process could she use? check all that apply.
Answers: 1
question
Mathematics, 21.06.2019 22:30
If a and −a are numbers on the number line, which expression must give the distance between them? a) 0 b) a c) |2a| d) |a|
Answers: 1
question
Mathematics, 21.06.2019 22:50
Ur environment is very sensitive to the amount of ozone in the upper atmosphere. the level of ozone normally found is 4.04.0 parts/million (ppm). a researcher believes that the current ozone level is not at a normal level. the mean of 2525 samples is 4.44.4 ppm with a standard deviation of 0.80.8. assume the population is normally distributed. a level of significance of 0.020.02 will be used. make the decision to reject or fail to reject the null hypothesis. answer tables
Answers: 3
You know the right answer?
Bob can do a job in 5 hours while Bill can do the same job in 8. How many hours would it take them,...
Questions
question
Mathematics, 04.06.2021 06:30
question
Mathematics, 04.06.2021 06:30
question
Mathematics, 04.06.2021 06:30
question
Mathematics, 04.06.2021 06:30
Questions on the website: 13722361