Mathematics, 05.11.2020 18:20 melmar76
One label on a package of bolts says that each bolt has a diameter of 0.55 inch. To be in the package,
the percent error of the diameter must be less than 4%. A test on the production line shows a bolt with
a diameter of 0.53 inch. Should this bolt go into the package?
Should this bolt go into the package?
Answers: 1
Mathematics, 21.06.2019 18:00
Place the following steps in order to complete the square and solve the quadratic equation,
Answers: 1
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 21:50
Desmond wants to sell his car that he paid $8,000 for 2 years ago. the car depreciated, or decreased in value, at a constant rate each month over a 2-year period. if x represents the monthly depreciation amount, which expression shows how much desmond can sell his car for today? \ 8,000 + 24x 8,000 - 24x 8,000 + 2x 8,000 - 2x
Answers: 3
One label on a package of bolts says that each bolt has a diameter of 0.55 inch. To be in the packag...
Mathematics, 30.04.2021 01:40
History, 30.04.2021 01:40
Physics, 30.04.2021 01:40
Mathematics, 30.04.2021 01:40
Mathematics, 30.04.2021 01:40
Mathematics, 30.04.2021 01:40
Mathematics, 30.04.2021 01:40
History, 30.04.2021 01:40
Mathematics, 30.04.2021 01:40
English, 30.04.2021 01:40
Mathematics, 30.04.2021 01:40