Mathematics, 12.11.2020 17:10 hellicuh
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Sample Service Life (hours) 1 495 500 505 500 2 525 515 505 515 3 470 480 460 470 If he uses upper and lower control limits of 520 and 480 hours, on what sample(s) (if any) does service life appear to be out of control?
Answers: 1
Mathematics, 21.06.2019 16:00
What are the measures of ∠a, ∠b, ∠c and ∠d? explain how to find each of the angle measure.
Answers: 1
Mathematics, 21.06.2019 22:00
What is the solution to the division problem below x3+x2-11x+4/x+4
Answers: 2
Mathematics, 21.06.2019 23:10
Which best describes the function on the graph? direct variation; k = −2 direct variation; k = -1/2 inverse variation; k = −2 inverse variation; k = -1/2
Answers: 2
A design engineer wants to construct a sample mean chart for controlling the service life of a halog...
Mathematics, 18.02.2020 05:53
English, 18.02.2020 05:53
English, 18.02.2020 05:55