Your manufacturing requires parts to go sequentially through process A, B, and C. A machine can do process A in 1
minute, B in 2 minutes, and C in 3 minutes. You have two A machines, one B machine, and three C machines. Which process is the bottleneck?
(can produce the fewest items per unit time)?

A) process a
B) process b
C) process c

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
In the field of thermodynamics, rankine is the unit used to measure temperature. one can convert temperature from celsius into rankine using the formula c= r/1.8 - 273, what is the temperature in celcius corresponding to r degrees rankine.
Answers: 2
question
Mathematics, 21.06.2019 14:00
9. (y^-5)^10y^10 a. y^-60 b. y^60 c. y^-150 d. y^150 find the simplified form of each expression. 10. (4/7^5)^2 a.8/14^10 b.16/49^25 c.16/49y^10 d.8/14y^25 11. determine if the number 3.43 times 10^-6 is written in scientific notation. if not, explain. a. yes; the number is written scientific notation. b. no; the first factor is not a number between 1 and 10. c. no; it is not written as a number times a power of 10
Answers: 3
question
Mathematics, 21.06.2019 16:00
Solve for x -2.3(r - 1.2 ) = -9.66 enter you answer as decimal.
Answers: 1
question
Mathematics, 21.06.2019 21:40
Which of the following best describes the graph below? + + 2 + 3 + 4 1 o a. it is not a function. o b. it is a one-to-one function. o c. it is a many-to-one function. o d. it is a function, but it is not one-to-one.
Answers: 3
You know the right answer?
Your manufacturing requires parts to go sequentially through process A, B, and C. A machine can do...
Questions
question
English, 08.03.2021 14:00
question
Mathematics, 08.03.2021 14:00
question
Mathematics, 08.03.2021 14:00
Questions on the website: 13722362