subject
Mathematics, 19.11.2020 23:50 scoutbuffy8954

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, determine which system of inequality best explains whether the company can build 10 child bikes and 12 adult bikes in the week. (2 points) a No, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 b No, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100 c Yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 d Yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
1. what is the formula for finding the vertical distance between two points on a coordinate plane?
Answers: 1
question
Mathematics, 21.06.2019 15:30
Suppose you want just guess at the answers in a 5 question multiple-choice test. each question has 3 responses and only one is correct. what is the probability of getting two questions right just guessing? 20 points 0.3275 0.2753 0.7532 none of the above
Answers: 3
question
Mathematics, 21.06.2019 15:30
The weight of an object in a particular scale is 175.2 lbs. the measured weight may vary from the actual weight by at most 0.1 lbs. what is the range of actual weights of the object
Answers: 3
question
Mathematics, 21.06.2019 18:30
Need an artist designed a badge for a school club. figure abcd on the coordinate grid below shows the shape of the badge: the badge is enlarged and plotted on the coordinate grid as figure jklm with point j located at (2, -2) and point m is located at (5, 4). which of these could be the coordinates for point l? a. (2, 4) b. (8, 4) c. (5, 1) d. (5, 7)
Answers: 2
You know the right answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...
Questions
question
Chemistry, 23.06.2019 11:30
question
Mathematics, 23.06.2019 11:30
question
History, 23.06.2019 11:30
Questions on the website: 13722363