subject
Mathematics, 20.11.2020 06:20 cassandraaa

The construction engineer calculated that she needed 3 support pillars of equal size. She ordered 7 2/3 tons of concrete to make the support pillars. How much concrete did she use for each support pillar?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Paint color preference children adults total 0.6 0.77 liked new paint color disliked new paint color 0.4 0.15 0.23 total 1.0 1.0 1.0 which value for x completes the conditional relative frequency table by column?
Answers: 2
question
Mathematics, 21.06.2019 21:30
What does independent variable and dependent variable mean in math?
Answers: 2
question
Mathematics, 21.06.2019 23:30
On this question. a hypothermia occurs when a person's body temperature drops below 95 degrees fahrenheit. write and solve an inequality that describes how much lower the body temperature of a person with hypothermia will be than the body temperature of a person with a normal temperature of 98.6 degrees fahrenheit
Answers: 1
question
Mathematics, 22.06.2019 00:00
Sun country bus lines has 80000 shares of stock outstanding what would the dividend per share of stock be from a dividends declaration of 109600
Answers: 1
You know the right answer?
The construction engineer calculated that she needed 3 support pillars of equal size. She ordered 7...
Questions
Questions on the website: 13722363