subject
Mathematics, 20.11.2020 19:00 romanlittlewood

Cuatro palas excavadoras hacen un trabajo de movimiento de tierras en 14 días. ¿Cuánto se tardaría en hacer ese mismo trabajo si se dispusiera de 7 palas excavadoras?
con operacion por fa

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 21:30
Select all the statements that apply to this figure
Answers: 2
question
Mathematics, 21.06.2019 23:30
It takes an ant farm 3 days to consume 1/2 of an apple. at that rate, in how many days will the ant farm consume 3 apples
Answers: 1
question
Mathematics, 22.06.2019 00:30
If you eat 4 medium strawberries, you get 48% of your daily recommenced amount of vitamin c. what fraction of your daily amount of vitamin c do you still need?
Answers: 1
question
Mathematics, 22.06.2019 01:40
Ahigh-altitude spherical weather balloon expands as it rises, due to the drop in atmospheric pressure. suppose that the radius r increases at the rate of 0.02 inches per second, and that r = 36 inches at time t = 0. determine the equation that models the volume v of the balloon at time t, and find the volume when t = 360 seconds. v(t) = 4π(0.02t)2; 651.44 in3 v(t) = 4π(36 + 0.02t)2; 1,694,397.14 in3 v(t) = four pi times the product of zero point zero two and t to the third power divided by three.; 4,690.37 in3 v(t) = four pi times the quantity of thirty six plus zero point zero two t to the third power divided by three.; 337,706.83 in3
Answers: 1
You know the right answer?
Cuatro palas excavadoras hacen un trabajo de movimiento de tierras en 14 días. ¿Cuánto se tardaría e...
Questions
question
Chemistry, 06.06.2021 22:50
Questions on the website: 13722362