subject
Mathematics, 28.11.2020 04:00 yadirachavez2002

A construction company can remove 3/4 tons of dirt from a construction site each hour. How long will it take them to remove 24 tons of dirt from the site?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:40
Which of the following is the correct equation for this function? a. y= (x+4)(x+2) b. y=x^2+ 3x – 2 c. y+ 2 = – 2(x+3)^2 d. y+ 2 = 2(x+3)^2
Answers: 1
question
Mathematics, 21.06.2019 20:40
Askate shop rents roller skates as shown on the table below. which graph and function models this situation?
Answers: 1
question
Mathematics, 21.06.2019 23:30
Write the percent as a fraction or mixed number in simplest form. 0.8%
Answers: 2
question
Mathematics, 22.06.2019 00:20
If your score on your next statistics test is converted to a z score, which of these z scores would you prefer: minus2.00, minus1.00, 0, 1.00, 2.00? why? a. the z score of 2.00 is most preferable because it is 2.00 standard deviations above the mean and would correspond to the highest of the five different possible test scores. b. the z score of 0 is most preferable because it corresponds to a test score equal to the mean. c. the z score of minus2.00 is most preferable because it is 2.00 standard deviations below the mean and would correspond to the highest of the five different possible test scores. d. the z score of minus1.00 is most preferable because it is 1.00 standard deviation below the mean and would correspond to an above average
Answers: 2
You know the right answer?
A construction company can remove 3/4 tons of dirt from a construction site each hour. How long will...
Questions
question
Spanish, 25.03.2020 23:34
Questions on the website: 13722360