subject
Mathematics, 30.11.2020 20:50 annikacorrea

The construction engineer calculated that she needed 6 support pillars of equal size. She ordered 3/4 of a ton of concrete to make the support pillars. How much concrete did she use for each support pillar?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
Nohas oven temperature gives a reading that is 2% greater than the actual temperature 9f the acutal temperature was 325°f what would the termometer reading be.
Answers: 2
question
Mathematics, 21.06.2019 15:20
Classify the following triangle check all that apply
Answers: 2
question
Mathematics, 21.06.2019 18:30
The lengths of two sides of a right triangle are given. find the length of the third side. round to the nearest tenth if necessary. a) y = 12/5x + 39/5 b) y = 5/12x + 5/39 c) y = 12/5x - 39/5 d) y = 5/12x - 5/39
Answers: 2
question
Mathematics, 21.06.2019 21:30
Your friend uses c=50p to find the total cost, c, for the people, p, entering a local amusement park is the cost of admission proportional to the amount of people entering the amusement park? explain.
Answers: 2
You know the right answer?
The construction engineer calculated that she needed 6 support pillars of equal size. She ordered 3/...
Questions
question
History, 06.09.2021 19:20
question
Chemistry, 06.09.2021 19:20
question
Mathematics, 06.09.2021 19:20
Questions on the website: 13722363