subject
Mathematics, 12.12.2020 17:10 itsgiovanna

A new process for producing a type of novolac resin is supposed to have a mean cycle time of 3.5 hours per batch. Six batches are produced, and their cycle times, in hours, were 3.45 3.47 3.57 3.52 3.40 3.62. Can you conclude that the mean cycle time is greater than 3.5 hours

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
If the measure of angle 1 is 110 degrees and the measure of angle 3 is (2 x+10 degree), what is the value of x?
Answers: 2
question
Mathematics, 21.06.2019 18:30
Thales was an ancient philosopher familiar with similar triangles. one story about him says that he found the height of a pyramid by measuring its shadow and his own shadow at the same time. if the person is 5-ft tall, what is the height of the pyramid in the drawing?
Answers: 3
question
Mathematics, 21.06.2019 22:00
Onnie is considering doing some long term investing with money that she inherited. she would like to have $50,000 at the end of 30 years. approximately how much money would lonnie need to put into an account earning 6% interest compounded annually in order to meet her goal?
Answers: 1
question
Mathematics, 22.06.2019 04:30
Amath test has a total of 20 problems some problems are worth two points and some are worth three points the whole test is worth 452 points how many three-point problems were there
Answers: 1
You know the right answer?
A new process for producing a type of novolac resin is supposed to have a mean cycle time of 3.5 hou...
Questions
question
Mathematics, 26.02.2021 01:00
question
Mathematics, 26.02.2021 01:00
question
Mathematics, 26.02.2021 01:00
Questions on the website: 13722362