subject
Mathematics, 23.12.2020 17:10 simmy6

4.8.2 Slope and Rise The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall be 1:12. The maximum rise for any ramp run shall be 30 inches. Curb ramps and ramps to be constructed on existing sites or in existing buildings or facilities may have slopes and rises, if space limitations prohibit the use of a 1:12 slope or less.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:50
Determine if the function below is continuous. a. continuous b. not continuous, 1 hole c. not continuous, > 2 holes d. not continuous, 2 holes
Answers: 1
question
Mathematics, 21.06.2019 20:30
1yd 1 ft = 1 1/12 1 1/3 1 1/2 1 1/6
Answers: 1
question
Mathematics, 21.06.2019 23:30
Scenario: susan wants to make 2 square flags to sell at a crafts fair. the fabric she wants to buy is 3 meters wide. she doesn't want any fabric left over. what's the least amount of fabric she should buy? question: which equation will susan solve her problem? note: let x represent the length of 1 side of the flag. options: 1) 2x^2 = 4x 2) 8 +2x = 2(4x) 3) 2 * 2 = 4 * 2 4) 4x^2 -2x = 0
Answers: 2
question
Mathematics, 22.06.2019 01:30
Which term describes the point where the perpendicular bisectors of the three sides of a triangle intersect?
Answers: 3
You know the right answer?
4.8.2 Slope and Rise The least possible slope shall be used for any ramp. The maximum slope of a ram...
Questions
question
Mathematics, 04.03.2021 01:00
question
Mathematics, 04.03.2021 01:00
question
English, 04.03.2021 01:00
question
Mathematics, 04.03.2021 01:00
question
Chemistry, 04.03.2021 01:00
question
Mathematics, 04.03.2021 01:00
Questions on the website: 13722359