subject
Mathematics, 08.01.2021 21:30 joeyhd

A civil engineering firm is analyzing street routes from the theatre to the park. It is considering a big construction project near the library which is 2 blocks north and 6 blocks east of the theatre. So as not to increase traffic, it will delay this project until the early winter if the probability of a random driver going through the library intersection is above 0.2. Will the engineering firm need to delay the project? Best explained answer will be marked brainliest.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Find the number of positive three-digit even integers whose digits are among 9, 8, 7,5, 3, and 1.
Answers: 2
question
Mathematics, 21.06.2019 16:30
What is the equation of a vertical line passing through the point (−5, −1)? y = −5 y = −1 x = −5 x = −1
Answers: 2
question
Mathematics, 21.06.2019 18:30
Three times the sum of a number and seven is negative thirty-six. what is the number?
Answers: 2
question
Mathematics, 21.06.2019 19:00
The fence around a quadrilateral-shaped pasture is 3a^2+15a+9 long. three sides of the fence have the following lengths: 5a, 10a-2, a^2-7. what is the length of the fourth side of the fence?
Answers: 1
You know the right answer?
A civil engineering firm is analyzing street routes from the theatre to the park. It is considering...
Questions
question
Biology, 25.06.2019 19:30
question
Chemistry, 25.06.2019 19:30
Questions on the website: 13722367