subject
Mathematics, 12.01.2021 01:50 jaibean1202

Fruit Computer Company manufactures memory chips in batches of ten chips. From past experience, Fruit knows that 80% of all batches contain 10% (1 out of 10) defective chips, and 20% of all batches contain 60% (6 out of 10) defective chips. If a good (that is, 10% defective) batch of chips is sent to the next stage of production, processing costs of $4000 are incurred, and if a bad batch (60% defective) is sent on to the next stage of production, processing costs of $16000 are incurred. Fruit also has the alternative of reworking a batch at a cost of $4000. A reworked batch is sure to be a good batch. Alternatively, for a cost of $400, Fruit can test one chip from each batch in an attempt to determine whether the batch is defective.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
Worth 30 points! in this diagram, both polygons are regular. what is the value, in degrees, of the sum of the measures of angles abc and abd?
Answers: 2
question
Mathematics, 21.06.2019 21:20
52 cm radius = diameter = area = circumference = circumfer
Answers: 1
question
Mathematics, 22.06.2019 00:00
Ineed on this question me get the answer
Answers: 1
question
Mathematics, 22.06.2019 01:00
X^2/100+y^2/25=1 the y-intercepts are at: a) (-10,0) and (10,0) b) (0,10) and (0,5) c) (0,-5) and (0,5)
Answers: 1
You know the right answer?
Fruit Computer Company manufactures memory chips in batches of ten chips. From past experience, Frui...
Questions
question
Mathematics, 18.01.2021 01:50
question
Mathematics, 18.01.2021 01:50
question
SAT, 18.01.2021 01:50
question
History, 18.01.2021 01:50
question
Mathematics, 18.01.2021 01:50
Questions on the website: 13722362