subject
Mathematics, 14.01.2021 03:30 iilovejohnccena1022

Based on the scatterplot and computer output, a reasonable estimate for the home's electric bill when
the mean monthly temperature is 76 degrees is:
A homeowner notices that the electric bill for the
house is often much higher in the summer months.
Collecting data from the last 18 monthly electric bills,
the amount of each bill is plotted against the mean
temperature for each month. The logs of both the
mean monthly temperature and the electric bill are
taken in order to develop a linear model.
HERE
O $145.30 because ý = 1.9313(76) - 1.4806 =
145.30
$8.60 because iny =1.9313(log 76) - 1.4806 =2.1518 and
e2.1518 = 8.60
log(Bill) vs. log(Temperature)
0 $141.85 because log y = 1.9313(log 76) - 1.4806 = 2.1518
2.3
and 102 1518 = 141.85.
2.25
22
0 $4,923.97 because log y = 1.9319(log 76) + 0.0599 =3.6923
2.15
and 103.6923 = 4923.97.
log(Bill)
21
205
Mark this and return
Save and Exit
Next
Submit


Based on the scatterplot and computer output, a

reasonable estimate for the home's electric bill

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
This is about circle theorems. someone asap : (
Answers: 1
question
Mathematics, 21.06.2019 21:00
Apiling for a high-rise building is pushed by two bulldozers at exactly the same time. one bulldozer exerts a force of 1250 pounds in a westerly direction. the other bulldozer pushes the piling with a force of 2650 pounds in a northerly direction. what is the direction of the resulting force upon the piling, to the nearest degree? a. 65 n of w b. 25 n of w c. 45 n of w d. 35 n of w
Answers: 1
question
Mathematics, 21.06.2019 21:30
The length of a field is 100 yards and its width is 75 yards. if 1 inch represents 25 yards, what would be the dimensions of the field drawn on a sheet of paper?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
Based on the scatterplot and computer output, a reasonable estimate for the home's electric bill wh...
Questions
question
Mathematics, 17.12.2021 09:20
question
English, 17.12.2021 09:20
question
Mathematics, 17.12.2021 09:20
question
Physics, 17.12.2021 09:30
question
English, 17.12.2021 09:30
question
Mathematics, 17.12.2021 09:30
Questions on the website: 13722363