Mathematics, 19.01.2021 01:00 2020seogang
A construction crew is lengthening a road. The road started with a length of 56 miles, and the crew is adding 4 miles to the road each day. Let L represent the total length of the road (in miles), and let D represent the number of days the crew has worked. Write an equation relating L to D. Then use this equation to find the total length of the road after the crew has worked 33 days. D=0 Equation: 0 Х $ ? miles Total length of the road after 33 days:
Answers: 3
Mathematics, 21.06.2019 18:00
Agraph of a trapezoid can have diagonals with slopes that are negative reciprocals and two pairs of adjacent sides that are congruent, true or false, and why
Answers: 1
Mathematics, 21.06.2019 23:00
The ratio of the perimeters of two similar triangles is 4: 3. what are the areas of these triangles if the sum of their areas is 130cm2?
Answers: 3
A construction crew is lengthening a road. The road started with a length of 56 miles, and the crew...
Mathematics, 23.10.2020 22:30
Mathematics, 23.10.2020 22:30
History, 23.10.2020 22:30
Mathematics, 23.10.2020 22:30
Mathematics, 23.10.2020 22:30
Mathematics, 23.10.2020 22:30
Mathematics, 23.10.2020 22:30
Mathematics, 23.10.2020 22:30
History, 23.10.2020 22:30