Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 22:00
Given: △acm, m∠c=90°, cp ⊥ am , ac: cm=3: 4, mp-ap=1. find am.
Answers: 2
Mathematics, 22.06.2019 00:30
Which equation could represent the relationship shown in the scatter plot? y=−3x−2 y=−3/4x+10 y=−2/3x+1 y=9x−12 scatter plot with x axis labeled variable x and y axis labeled variable y. points go from upper left to lower right.
Answers: 1
Mathematics, 22.06.2019 01:30
△abc is similar to △xyz. also, side ab measures 6 cm, side bc measures 18 cm, and side xy measures 12 cm. what is the measure of side yz ? enter your answer in the box.
Answers: 2
Free points for people who need them and also here to answer questions...
Mathematics, 25.07.2019 03:30
Mathematics, 25.07.2019 03:30
Geography, 25.07.2019 03:30
Mathematics, 25.07.2019 03:30
Mathematics, 25.07.2019 03:30
Mathematics, 25.07.2019 03:30
Biology, 25.07.2019 03:30
Mathematics, 25.07.2019 03:30
History, 25.07.2019 03:30
Physics, 25.07.2019 03:30