subject
Mathematics, 21.01.2021 22:50 pcartei

A quality control specialist at a plate glass factory must estimate the mean clarity rating of a new batch of glass sheets being produced using a sample of 18 sheets of glass. The actual distribution of this batch is unknown, but preliminary investigations show that a normal approximation is reasonable. The specialist decides to use a t- distribution rather than a z-distribution because (A) The z-distribution is not appropriate because the sample size is too small.
(B) The sample size is large compared to the population size.
(C) The data comes from only one batch.
(D) The variability of the batch is unknown.
(E) The t-distribution results in a narrower confidence interval.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Use the graph of the sine function y=2sinθ shown below
Answers: 1
question
Mathematics, 21.06.2019 17:30
Terri makes a quilt using three sizes of fabric squares the side lenght of each fabric square is the square root of the area
Answers: 2
question
Mathematics, 22.06.2019 01:00
Mia’s gross pay is 2953 her deductions total 724.15 what percent if her gross pay is take-home pay
Answers: 2
question
Mathematics, 22.06.2019 05:30
Shade a model for 1.4 divided by 0.7
Answers: 1
You know the right answer?
A quality control specialist at a plate glass factory must estimate the mean clarity rating of a new...
Questions
question
Social Studies, 07.05.2021 15:30
question
History, 07.05.2021 15:30
question
Mathematics, 07.05.2021 15:30
question
Mathematics, 07.05.2021 15:30
question
Mathematics, 07.05.2021 15:30
Questions on the website: 13722362