subject
Mathematics, 25.01.2021 19:40 leeenaaa95

A factory process requires 3 steps to finish a product. The steps each have a mean completion time of h = 10 seconds and a standard deviation of o = 5 seconds. The time it takes to complete each step is

independent from the other steps. Let T be the total completion time of the 3 steps on a randomly chosen

product.

Find the mean of T.

pir=

seconds

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Sanya noticed that the temperature was falling at a steady rate of 1.4 degrees every hour from the time that she first checked her outdoor thermometer. by 6 a.m., the temperature had fallen 21 degrees. which expression can you use to find how many hours earlier she had first checked the thermometer?
Answers: 3
question
Mathematics, 21.06.2019 23:00
In triangle △abc, ∠abc=90°, bh is an altitude. find the missing lengths. ac=26 and ch=8, find bh.
Answers: 3
question
Mathematics, 21.06.2019 23:40
In the diagram, a building cast a 35-ft shadow and a flagpole casts an 8-ft shadow. if the the flagpole is 18 ft tall, how tall is the building? round the the nearest tenth.
Answers: 2
question
Mathematics, 22.06.2019 02:30
Megan is making bracelets to sell to earn money for the local animal shelter. it takes her 1/4 hour to pick out all the beads and 1/10 hour to string them.this week, she only has 5 1/4 hours to make bracelets. how many bracelets will megan be able to make?
Answers: 1
You know the right answer?
A factory process requires 3 steps to finish a product. The steps each have a mean completion time o...
Questions
question
Mathematics, 05.05.2020 14:30
question
Spanish, 05.05.2020 14:30
question
Biology, 05.05.2020 14:30
Questions on the website: 13722363