The project scheduling tool PERT (Program Evaluation and Review Technique) assumes a beta probability distribution for time estimates. Which is NOT one of the three time estimates the model uses to calculate expected completion time?
les)
A)
Optimistic Time
B)
Most Likely Time
Least Likely Time
D)
Pessimistic Time

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 22.06.2019 00:00
The equation of a parabola is given. y=18x2+4x+20 what are the coordinates of the focus of the parabola?
Answers: 2
question
Mathematics, 22.06.2019 00:00
Ineed on this question me get the answer
Answers: 1
question
Mathematics, 22.06.2019 00:10
2,10,-50 next two numbers geometric sequence
Answers: 1
question
Mathematics, 22.06.2019 01:00
Atriangle has side lengths of x, x+11, and 3x+5. what is the perimeter?
Answers: 1
You know the right answer?
The project scheduling tool PERT (Program Evaluation and Review Technique) assumes a beta probabilit...
Questions
question
Mathematics, 30.01.2022 14:00
question
Biology, 30.01.2022 14:00
Questions on the website: 13722362