Mathematics, 27.01.2021 03:30 xxtonixwilsonxx
The project scheduling tool PERT (Program Evaluation and Review Technique) assumes a beta probability distribution for time
estimates. Which is NOT one of the three time estimates the model uses to calculate expected completion time?
les)
A)
Optimistic Time
B)
Most Likely Time
Least Likely Time
D)
Pessimistic Time
Answers: 2
Mathematics, 22.06.2019 00:00
The equation of a parabola is given. y=18x2+4x+20 what are the coordinates of the focus of the parabola?
Answers: 2
Mathematics, 22.06.2019 01:00
Atriangle has side lengths of x, x+11, and 3x+5. what is the perimeter?
Answers: 1
The project scheduling tool PERT (Program Evaluation and Review Technique) assumes a beta probabilit...
Mathematics, 30.01.2022 14:00
Mathematics, 30.01.2022 14:00
Mathematics, 30.01.2022 14:00
Geography, 30.01.2022 14:00
History, 30.01.2022 14:00
Chemistry, 30.01.2022 14:00
Biology, 30.01.2022 14:00
Biology, 30.01.2022 14:00
Mathematics, 30.01.2022 14:00