Mathematics, 08.02.2021 01:40 dalilaoliva12
Braverman Company has two manufacturing departments-Finishing and Fabrication. The predetermined overhead rates in Finishing
and Fabrication are $18.00 per direct labor-hour and 110% of direct materials cost, respectively. The company's direct labor wage rate
is $16.00 per hour. The following information pertains to Job 700:
Direct materials
Direct labor
Finishing
$410
$128
Fabrication
$ 60
$ 48
Required:
1. What is the total manufacturing cost assigned to Job 700?
2. If Job 700 consists of 15 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.)
1 Total manufacturing cost $ 210
2 Unit product cost
per unit
Answers: 3
Mathematics, 21.06.2019 15:30
For what is the measure of the angle at the top of the shed? a. multiplication of areas b. squaring of areas c. addition of areas d. division of areas
Answers: 1
Mathematics, 21.06.2019 18:00
Solve this system of equations. 12x − 18y = 27 4x − 6y = 10
Answers: 1
Mathematics, 21.06.2019 19:30
You have 17 cats that live in houses on your street, 24 dogs, 3 fish, and 4 hamsters. what percent of animals on your block are dogs?
Answers: 2
Mathematics, 21.06.2019 20:30
Find the value of x for which line a is parallel to line b
Answers: 1
Braverman Company has two manufacturing departments-Finishing and Fabrication. The predetermined ove...
English, 05.10.2020 14:01
Mathematics, 05.10.2020 14:01
History, 05.10.2020 15:01
Mathematics, 05.10.2020 15:01
Mathematics, 05.10.2020 15:01
Biology, 05.10.2020 15:01
Mathematics, 05.10.2020 15:01
Mathematics, 05.10.2020 15:01
Mathematics, 05.10.2020 15:01
Mathematics, 05.10.2020 15:01