7) Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturing departments—Molding and Fabrication. It started, completed, and sold only two jobs during March—Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and Q (all data and questions relate to the month of March): Molding Fabrication Total
Estimated total machine-hours used 2,500 1,500 4,000
Estimated total fixed manufacturing overhead $ 12,250 $ 16,350 $ 28,600
Estimated variable manufacturing overhead per machine-hour $ 2.30 $ 3.10

Job P Job Q
Direct materials $ 22,000 $ 12,500
Direct labor cost $ 28,200 $ 11,100
Actual machine-hours used:
Molding 2,600 1,700
Fabrication 1,500 1,800
Total 4,100 3,500

Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month.

Required:

For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments.

7. Assume that Sweeten Company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. What selling price would the company have established for Jobs P and Q? What are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for Job P and 30 units were produced for Job Q? (Do not round intermediate calculations. Round your final answers to nearest whole dollar.)

Job P Job Q
Total Price for the job
Selling Price per unit

8) Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturing departments—Molding and Fabrication. It started, completed, and sold only two jobs during March—Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and Q (all data and questions relate to the month of March):

Molding Fabrication Total
Estimated total machine-hours used 2,500 1,500 4,000
Estimated total fixed manufacturing overhead $ 12,250 $ 16,350 $ 28,600
Estimated variable manufacturing overhead per machine-hour $ 2.30 $ 3.10

Job P Job Q
Direct materials $ 22,000 $ 12,500
Direct labor cost $ 28,200 $ 11,100
Actual machine-hours used:
Molding 2,600 1,700
Fabrication 1,500 1,800
Total 4,100 3,500

Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month.

Required:

For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments.

8)What was Sweeten Company’s cost of goods sold for March? (Do not round intermediate calculations.)
Cost of goods sold

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Steve wants to develop a way to find the total cost of any item including sales tax. the sales tax in his city is 6%. his friend jenna writes the expression x + 6x where x is the cost of the item. explain whether her expression is correct based on the situation.
Answers: 1
question
Mathematics, 21.06.2019 18:30
The school that imani goes to is selling tickets to the annual dance competition. on the first day of the ticket sales the school sold 7 adult tickets and 5 child tickets for a total of $96. the school took in $40 on the second day by seling 3 adult tickets . find the price of an adult ticket and the price of a child ticket. solve by using substitution elimination college prep algebra math heres the 2 equations i came up with 7x+5y=96 and 3x+2y= -40 show all workiv be stuck on this.
Answers: 1
question
Mathematics, 21.06.2019 22:00
Question 10 of 211 pointuse the elimination method to solve the system of equations. choose thecorrect ordered pair.10x +2y = 643x - 4y = -36a. (4,12)b. (-3, 11)c. (2,10)d. (-5, 8)
Answers: 1
question
Mathematics, 21.06.2019 22:00
Which of the following graphs could represent a cubic function?
Answers: 1
You know the right answer?
7) Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. T...
Questions
question
History, 23.01.2020 02:31
question
English, 23.01.2020 02:31
Questions on the website: 13722363