subject
Mathematics, 08.02.2021 20:40 andreawright13

At a factory, two machines pack bottles into boxes for shipping. Machine A can pack 8 boxes per minute, and Machine B can pack 11 boxes per minute. Before shipment, an inspector found that 7 of
the boxes packed by Machine A were defective and could not be shipped. At least 200 boxes packed
by Machine A were approved for shipment. Write and solve an inequality to find the amount of time
Machine A spent packing the boxes that were approved for shipment.


At a factory, two machines pack bottles into boxes for shipping. Machine A can pack 8 boxes per

m

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Which simplifys to a+ b? a-(1-b)+1 -(1-a)-b+1 (a--1) -1)+1
Answers: 1
question
Mathematics, 21.06.2019 21:20
What is the area of a triangle with vertices at (-3 3) (-3,2) and (1,2)?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Look at the figure below: triangle abc is a right triangle with angle abc equal to 90 degrees. the length of ac is 5 units and the length of ab is 4 units. d is a point above c. triangle adc is a right triangle with angle dac equal to 90 degrees and dc parallel to ab. what is the length, in units, of segment cd?
Answers: 1
question
Mathematics, 21.06.2019 22:30
How can you find the mean absolute deviation (mad) for this set of data?
Answers: 3
You know the right answer?
At a factory, two machines pack bottles into boxes for shipping. Machine A can pack 8 boxes per min...
Questions
question
Mathematics, 05.10.2020 21:01
question
Mathematics, 05.10.2020 21:01
question
English, 05.10.2020 21:01
question
Mathematics, 05.10.2020 21:01
question
Mathematics, 05.10.2020 21:01
Questions on the website: 13722359