subject
Mathematics, 09.02.2021 01:20 theeflyguy5

One of the assumptions underlying the theory of control charting is that successive plotted points are independent of one another. Each plotted point can signal either that a manufacturing process is operating correctly or that there is some sort of malfunction. Even when a process is running correctly, there is a small probability that a particular point will signal a problem with the process. Suppose that this probability is 0.05. What is the probability that at least one of 10 successive points indicates a problem when in fact the process is operating correctly? (Round your answer to three decimal places.) What is the probability that at least one of 45 successive points indicates a problem when in fact the process is operating correctly? (Round your answer to three decimal places.)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:20
The probability of winning something on a single play at a slot machine is 0.11. after 4 plays on the slot machine, what is the probability of winning at least once
Answers: 1
question
Mathematics, 21.06.2019 18:00
George has seven boxes of five pencils. giulio three boxes of eight pencils. one of the boys arranges all his pencils equally into two groups. was this george or giulio how many are in each group explain
Answers: 1
question
Mathematics, 21.06.2019 18:00
In triangle △abc, ∠abc=90°, bh is an altitude. find the missing lengths. ah=4 and hc=1, find bh.
Answers: 1
question
Mathematics, 21.06.2019 18:30
Atriangle with all sides of equal length is a/an triangle. a. right b. scalene c. equilateral d. isosceles
Answers: 2
You know the right answer?
One of the assumptions underlying the theory of control charting is that successive plotted points a...
Questions
question
Mathematics, 04.05.2021 01:50
question
Mathematics, 04.05.2021 01:50
Questions on the website: 13722361