subject
Mathematics, 09.02.2021 04:50 kyeilahj

What is the quantity of work done when a crane lifts a 100-N block from 2 m above the ground to 6 m above the ground? A. 100 J
B. 200 J
C. 400 J
D. 600 J

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:40
If the slope of one line equals the slope of another line then ? a) the two lines are intersecting lines b) the two lines are perpendicular lines c) the two lines are parallel lines d) the two lines always have very steep slopes
Answers: 3
question
Mathematics, 21.06.2019 19:00
The diagonals of a quadrilaretral intersect at (-1,4). one of the sides of the quadrilateral is bounded by (2,7) and (-3,5) determine the coordinates of the other side in order for the quadrilaretral to be a square.
Answers: 1
question
Mathematics, 21.06.2019 21:30
In a two-digit number the units' digit is 7 more than the tens' digit. the number with digits reversed is three times as large as the sum of the original number and the two digits. find the number.
Answers: 2
question
Mathematics, 21.06.2019 21:30
Amira is painting a rectangular banner 2 1/4 yards wide. the banner will have a blue background. amira has enough paint to cover 1 1/2 square yards of the wall. the school colors are blue and yellow, so amira wants to add yellow rectangles on the left and right sides of the blue rectangle. the yellow rectangles will each be 3/4 yards wide and the same height as the blue rectangle. what will be the total area of the two yellow rectangles?
Answers: 3
You know the right answer?
What is the quantity of work done when a crane lifts a 100-N block from 2 m above the ground to 6 m...
Questions
question
Mathematics, 16.01.2020 01:31
question
Mathematics, 16.01.2020 01:31
Questions on the website: 13722363