subject
Mathematics, 16.02.2021 21:00 cnejcnefjvefven47

A construction crew needs to pave a road that is 206 miles long. The crew paves 9 miles of the road each day. The length, L (in miles), that is left to be paved after d days is given by the following function


A construction crew needs to pave a road that is 206 miles long. The crew paves 9 miles of the road

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Acircular city park has a sidewalk directly through the middle that is 111 - feet long. if each bag of fertilizer covers 50 square feet, then determine how many bags of fertilizers the parks and recreation department needs to use to cover the circular park. ignore all the sidewalks around and through the park.
Answers: 1
question
Mathematics, 21.06.2019 21:30
Jonathan can type 20 documents in 40 minutes ,and susan can type it in 30 minutes and jack can type it in 24 minutes working together ,how much time will it is take them type the same document
Answers: 1
question
Mathematics, 22.06.2019 00:10
Hello, i need compare km^2 and km. what's difference in this?
Answers: 2
question
Mathematics, 22.06.2019 02:30
Abby is collecting rainfall data. she finds that one value of the data set is a high-value outlier. which statement must be true? abby will use a different formula for calculating the standard deviation. the outlier will increase the standard deviation of the data set. the spread of the graph of the data will not change. abby will not use the mean when calculating the standard deviation.
Answers: 3
You know the right answer?
A construction crew needs to pave a road that is 206 miles long. The crew paves 9 miles of the road...
Questions
question
Mathematics, 01.07.2019 04:50
question
Mathematics, 01.07.2019 04:50
Questions on the website: 13722363