subject
Mathematics, 17.02.2021 21:30 javondailey2891

A construction company can remove 4 1/2 metric tons of dirt from a construction site in 3 3/8 hours. What is the unit rate in metric tons per hour?

Write your answer as a fraction or a mixed number in simplest form.


A construction company can remove 4 1/2 metric tons of dirt from a construction site in 3 3/8 hours

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
This is about circle theorems. someone asap : (
Answers: 1
question
Mathematics, 21.06.2019 21:00
The? half-life of a radioactive substance is 20 years. if you start with some amount of this? substance, what fraction will remain in 120 ? years
Answers: 1
question
Mathematics, 21.06.2019 23:40
For a science project, a high school research team conducted a survey of local air temperatures. based on the results of the survey, the found that the average temperatures were around 10 degrees higher than expected. this result was wrong. the trouble with the survey was that most of the locations were exposed to direct sunlight and located over asphalt or sand, which resulted in higher temperatures than normal. this is a classic example of an error in which phase of inferential statistics?
Answers: 1
question
Mathematics, 22.06.2019 01:30
Care repairs are less than or equal to $500
Answers: 2
You know the right answer?
A construction company can remove 4 1/2 metric tons of dirt from a construction site in 3 3/8 hours....
Questions
Questions on the website: 13722360