Mathematics, 19.02.2021 14:00 deidaraXneji
A woman can do a job in 9 days and her daughter can do the same job in 16 days. They start working together, but after 4 days the daughter leaves and the woman finishes the job alone. How many days did it take her to finish the job alone?
Answers: 1
Mathematics, 21.06.2019 18:30
Isuck at math ; ^; m a student solved this problem and said the answer is 3 feet. chase had a roll of ribbon that contained 7 7/8 feet of ribbon. he cut off one piece that was 3 5/8 feet long and another piece that was 1 1/4 feet from the roll. how much ribbon was left on the roll? is the student's answer reasonable? yes, the answer is reasonable. no, the answer is not reasonable. it should be about 2 feet. no, the answer is not reasonable. it should be about 13 feet. no, the answer is not reasonable. it should be about 4 feet.
Answers: 1
Mathematics, 21.06.2019 20:30
What is the difference between the equations of a vertical and a horizontal line?
Answers: 2
Mathematics, 21.06.2019 21:00
Calculate the missing value. round the answer to on decimal place. start with 70, increase it by 21%, and end up with
Answers: 2
A woman can do a job in 9 days and her daughter can do the same job in 16 days. They start working t...
Mathematics, 17.06.2021 17:30
Physics, 17.06.2021 17:30
Mathematics, 17.06.2021 17:30
Mathematics, 17.06.2021 17:30
Mathematics, 17.06.2021 17:30
History, 17.06.2021 17:30
Mathematics, 17.06.2021 17:30
Mathematics, 17.06.2021 17:40
Mathematics, 17.06.2021 17:40
Mathematics, 17.06.2021 17:40