Mathematics, 19.02.2021 16:10 Jspice1996
Quality control. As part of a quality control process for computer chips, an engineer at a factory randomly samples 212 chips during a week of production to test the current rate of chips with severe defects. She finds that 27 of the chips are defective.
(a) What population is under consideration in the data set?
(b) What parameter is being estimated?
(c) What is the point estimate for the parameter?
(d) What is the name of the statistic can we use to measure the uncertainty of the point estimate?
(e) Compute the value from part (d) for this context.
(f) The historical rate of defects is 10%. Should the engineer be surprised by the observed rate of defects
during the current week?
(g) Suppose the true population value was found to be 10%. If we use this proportion to recompute the
value in part (e) using p = 0.1 instead of pˆ, does the resulting value change much?
Answers: 1
Mathematics, 21.06.2019 19:30
Look at this pattern ; 1,4,9, number 10000 belongs in this pattern . what’s the place of this number?
Answers: 3
Mathematics, 21.06.2019 23:00
Solve the problem by making up an equation. a man could arrive on time for an appointment if he drove the car at 40 mph; however, since he left the house 15 minutes late, he drove the car at 50 mph and arrive 3 minutes early for the appointment. how far from his house was his appointment?
Answers: 1
Mathematics, 21.06.2019 23:30
In a right triangle δabc, the length of leg ac = 5 ft and the hypotenuse ab = 13 ft. find: b the length of the angle bisector of angle ∠a.
Answers: 1
Quality control. As part of a quality control process for computer chips, an engineer at a factory r...
Mathematics, 12.10.2020 14:01
Mathematics, 12.10.2020 14:01
Mathematics, 12.10.2020 14:01
Chemistry, 12.10.2020 14:01
Mathematics, 12.10.2020 14:01
Mathematics, 12.10.2020 14:01
Mathematics, 12.10.2020 14:01
Social Studies, 12.10.2020 14:01
English, 12.10.2020 14:01
English, 12.10.2020 14:01