During construction the workers need to mix dried bentonite into the concrete as it is being mixed to get the desired consistency. The workers decide to mix 800 mg of

Bentonite to be mixed with 198 lb of concrete mix every 8 hours. The information for the

concrete shows that 25-75 mg/kg per day is the appropriate mixture consistency. Are

the workers within the desired range? (Note: 1kg = 2.2 lbs)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:40
The graph of h(x)= |x-10| +6 is shown. on which interval is this graph increasing
Answers: 2
question
Mathematics, 21.06.2019 19:00
Which table represents a linear function? i'll give brainliest to first answer ^'^
Answers: 1
question
Mathematics, 21.06.2019 20:00
Ana drinks chocolate milk out of glasses that each holdof a liter. she has of a liter of chocolate milk in her refrigerator. 10 how many glasses of chocolate milk can she pour?
Answers: 2
question
Mathematics, 21.06.2019 20:30
Justin has 750 more than eva and eva has 12 less than justin together they have a total of 63 how much money did
Answers: 1
You know the right answer?
During construction the workers need to mix dried bentonite into the concrete as it is being mixed...
Questions
question
Biology, 22.06.2019 20:00
question
Mathematics, 22.06.2019 20:00
Questions on the website: 13722359